Discuss workflow

Industry

Order Entry Automation for PVF and Plumbing Distributors

Emailed purchase orders into your ERP for pipe, valve and fitting distributors — with spec, schedule and material detail kept on the line.

Input
Email, PDF, spreadsheet, scan
Output
Reviewed ERP import file
First step
Free snapshot, 3–5 days

What arrives on the desk

Project takeoffs, contractor spreadsheets, and marked-up submittals — often for a job rather than a stocking order, with a delivery date tied to a site schedule.

What makes this vertical different

These are the details that decide whether an order is right, and the ones that generic document automation treats as ordinary text.

Schedule and material are the identity of the line

Two-inch pipe is not an item. Two-inch, Schedule 40, A53 Grade B, black is an item, and 316L stainless at the same nominal size is a different one at several times the price. Where the customer's document abbreviates or omits part of that spec, the line is ambiguous by definition and FrontBeacon blocks rather than picking the most likely match.

Heat numbers and mill certs follow the material

Traceability requirements attach to specific material, not to the order as a whole. A requirement noted once on a cover page applies to lines further down, so it stays visible against those lines in the draft rather than being lost with the page it appeared on.

Job orders carry a release schedule

A project order is often not shipped in one go. The date structure in the document matters as much as the quantities, and a draft that flattens it into a single delivery date is wrong in a way that surfaces weeks later on site.

The Order Desk queue. Four summary tiles show orders needing attention, orders ready for the ERP, the auto-pass rate and the queue total, above a table of orders with their line counts, how many need review, and a status of Blocked, Needs review or Ready to export.
The queue, ordered so the blocked work is first. Every company name here is invented for our demo environment, and the percentages are properties of that fixture rather than a measured production rate.

What we do not do

FrontBeacon prepares the order. Your ERP stays authoritative for pricing, credit, availability, tax and freight, and a person on your desk approves every order before it becomes an import file. We do not release orders, choose substitutions, or make commercial decisions on your behalf.

Common questions

Our orders come as project takeoffs, not clean POs. Does that work?
It is worth testing on your own documents rather than taking an answer here. The Accuracy Snapshot exists for exactly this — it reports what matched and what did not on your real takeoffs, in three to five days, before anyone commits to anything.
Can it price the order?
No, and it will not try. Pricing, availability and credit stay with your ERP. FrontBeacon prepares the order; it does not make commercial decisions.

Common ERPs in this vertical

Accuracy snapshot

See what it does to your own purchase orders first.

Send 1525 redacted purchase orders. In 3–5 days you get back what matched, what did not, and why — with every extracted field shown beside the original page. No integration, no ERP access, no workflow change, and no charge.